Paint System Builder
  • Member Log In
  • Estimating Courses
  • Contact
Paint System Builder Guide

1

  • The Concept
  • System Information
  • About Production Rates
  • Wall
  • Ceiling
  • Floor
  • Soffit
  • Fascia
  • Door
  • Door Frame

2

  • Linear
  • Square Foot
  • Time
  • Single Pipe Rail
  • Stair, Rail and Riser
  • Surface Area
  • Labor Only
  • Number of Coats
  • System Net Totals
  • System Sundries

3

  • System Taxes, Insurance
  • System Margin, Markup
  • System Overhead - Gross Margin
  • System Overhead - Straight Markup
  • System Profit - Gross Margin
  • System Profit - Straight Markup
  • Man Days
  • Material
  • System Grand Totals
  • One Last Thing
  • Home
  • Airplanes
    • Flyer Basic Go fast, don't crash.
    • Flyer Intermediate Go even faster and don't crash.
    • Flyer Matrix Edition Haul cargo long distances.
    • ExpressRocket Launch cargo into space on the cheap.
    • Boomslang Level 1 Get certified for night operations.
    Helicopter
    • Liftmeister 21 The ultimate light utility helicopter.
    • Heavymeister Lift large amounts of weight.
    • Triblade Vortex Multi-engine reliability.
    • Rugged & Heavy Industry Designed to take a beating and keep flying.
    • Identity 6000 The ultimate in business luxury travel.
    • Small Business Accept and display widgets.
    • Medium Business Widgets for teams larger than 100.
    • Enterprise Enterprise-grade reliability and security.
    • Organizations Do even more with widgets.
  • Documentation
    • Getting Started Guide
    • API Reference
    • Sample Code
    • Plugin Developer Handbook
    Developer Community
    • Forums
    • Slack Channel
    • Facebook Group
  • Custom Dropdown
    Design your dropdowns with Breakdance.
Copyright @ 2024 Carter School of Estimating